PROJECT: DESIGN, CONSTRUCTION, SUPPLY, AND INSTALLATION OF TECHNOLOGICAL EQUIPMENT AND SCADA CONTROL SYSTEM
- Investor: Hai Chau Vietnam Company Limited
- Status: New construction
- Capacity: 50 MLD
- Completion: 6/2023
- Scope of work: Design, construction, supply, and installation of technological equipment and SCADA control system for Toc Tien 2 Water Plant Phase 1 in the form of EPC Turnkey.
The project includes:
- Raw water pumping station, capacity 150,000 m3/day;
- Raw water pipeline, HDPE Ø1000, L = 12 km;
- Flow distribution tank;
- Water treatment facilities, capacity 50,000 m3/day;
- Reservoir, A1: 3,000 m3 and A2: 4,500 m3;
- Clean water pumping station, capacity 72,000 m3/day;
- Chemical building; Chlorination building.
- Sludge treatment system.