PROJECT: UPGRADING CAPACITY OF SEDIMENTATION TANKS NO.6 & 7 AT THU DUC WATER TREATMENT PLANT FROM 70 MLD TO 150 MLD
- Investor: Saigon Water Corporation (SAWACO)
- Status: Capacity uprate from 70 MLD to 150 MLD
- Capacity: 150 MLD
- Completion: December 2022
- Scope of work: Design, construction, supply, installation of equipment, and control system for uprating capacity of SedimentationTanks No.6 & 7 at Thu Duc Water Treatment Plant from 70 MLD to 150 MLD.
The project includes:
- Supply and installation of 36 TK Plate® Settler lamella modules.
- Supply and installation of 02 TK Collector® syphon sludge removal systems.
- Electrical control system.
TK+ project achievements