SEDIMENTATION TANKS NO. 6 & 7, THU DUC WTP – 750,000 M3/DAY

PROJECT: UPGRADING CAPACITY OF SEDIMENTATION TANKS NO.6 & 7 AT THU DUC WATER TREATMENT PLANT FROM 70 MLD TO 150 MLD

  • Investor: Saigon Water Corporation (SAWACO)
  • Status: Capacity uprate from 70 MLD to 150 MLD
  • Capacity: 150 MLD
  • Completion: December 2022
  • Scope of work: Design, construction, supply, installation of equipment, and control system for uprating capacity of SedimentationTanks No.6 & 7 at Thu Duc Water Treatment Plant from 70 MLD to 150 MLD.

The project includes:

  • Supply and installation of 36 TK Plate® Settler lamella modules.
  • Supply and installation of 02 TK Collector® syphon sludge removal systems.
  • Electrical control system.