outstanding project

TOC TIEN WATER TREATMENT PLANT PHASE 2 – 50.000 M3/DAY

TOC TIEN WATER TREATMENT PLANT PHASE 2 – 50.000 M3/DAY

17/04/2024

PROJECT: DESIGN, CONSTRUCTION, SUPPLY, AND INSTALLATION OF TECHNOLOGICAL EQUIPMENT AND SCADA CONTROL SYSTEM Investor: Hai Chau Vietnam Company Limited Status: New construction Capacity: 50 MLD Completion: 6/2023 Scope of work: Design, construction, supply, and installation of technological equipment and SCADA control system for Toc Tien 2 Water Plant Phase 1 in the form of EPC…

Xem thêm
RANG DONG INDUSTRIAL PARK WATER TREATMENT PLANT CAPACITY OF 170MLD. PHASE 1 CAPACITY OF 30MLD

RANG DONG INDUSTRIAL PARK WATER TREATMENT PLANT CAPACITY OF 170MLD. PHASE 1 CAPACITY OF 30MLD

17/04/2024

PROJECT: SUPPLY AND INSTALLATION OF LAMELLA PLATE SETTLER SYSTEM TK PLATE® SETTLER TECHNOLOGY Investor: RANG DONG INFRASTRUCTURE DEVELOPMENT AND INVESTMENT JOINT STOCK COMPANY Main Contractor: GOSHU KOHSAN CO., LTD (VIETNAM) Status: New construction Capacity: 30 MLD Completion: 09/2023 Scope of work: Supplying and installing 08 high-rate settling modules TK Plate® Settler. TK+ project achievements

Xem thêm
HOÀNH BỒ WATER TREATMENT PLANT – 30,000 M3/DAY

HOÀNH BỒ WATER TREATMENT PLANT – 30,000 M3/DAY

17/04/2024

PROJECT: UPGRADING HOÀNH BỒ WATER PLANT FROM 10,000 M3/DAY TO 30,000 M3/DAY Investor: Quang Ninh Clean Water Joint Stock Company (QUAWACO) Capacity: Upgraded from 10 MLD to 30 MLD Status: Renovation Completion: 05/2023 Scope of work: Supply, installation equipment for the upgrade and renovation of Hoanh Bo Water Plant from conventional sedimentation tanks to high-rate…

Xem thêm
VO CANH WATER TREATMENT PLANT PHASE 2 – 80.000.3/DAY

VO CANH WATER TREATMENT PLANT PHASE 2 – 80.000.3/DAY

17/04/2024

PROJECT: UPGRADING THE FILTRATION CAPACITY OF VÕ CẠNH WATER PLANT FROM 30,000 M3/DAY TO 80,000 M3/DAY Investor: Khanh Hoa Joint Stock Company Status: Renovation Capacity: Uprating from 30 MLD to 80 MLD Completion: April 2023 Scope of work: Supply and installation of HDPE underdrain for filter (Leopold – USA) to replace nozzles. Replacement of filter…

Xem thêm
CAU BACH WATER TREATMENT PLANT – 32.000 M3/DAY

CAU BACH WATER TREATMENT PLANT – 32.000 M3/DAY

17/04/2024

PROJECT: RENOVATION AND CAPACITY UPGRADE OF THE SETTLING SYSTEM AT CAU BACH WATER PLANT FROM 20 MLD TO 32 MLD Investor: Nghe An Water Supply Joint Stock Company Status: Renovation Capacity: Upgraded from 20 MLD to 32 MLD Completion: 03/2023 Scope of work: Supplying and installing 08 TK Plate® Settler high-rate settling modules. TK+ project…

Xem thêm
HOANG MAI WTP – 56.000.M3/DAY

HOANG MAI WTP – 56.000.M3/DAY

17/04/2024

PROJECT: SUPPLY, INSTALLATION LAMELLA SYSTEM TK PLATE® SETTLER Investor: Hoang Thinh Dat Joint Stock Company EPC Contractor: KOBELCO ECO SOLUTION VIETNAM CO.,LTD Capacity: 56 MLD Completion: 03/2021 Scope of work: Supply and installation of 16 high-rate TK Plate® Settler modules and 02 TK Collector® siphon sludge suction systems. TK+ project achievements

Xem thêm