CAU BACH WATER TREATMENT PLANT – 32.000 M3/DAY

PROJECT: RENOVATION AND CAPACITY UPGRADE OF THE SETTLING SYSTEM AT CAU BACH WATER PLANT FROM 20 MLD TO 32 MLD

  • Investor: Nghe An Water Supply Joint Stock Company
  • Status: Renovation
  • Capacity: Upgraded from 20 MLD to 32 MLD
  • Completion: 03/2023
  • Scope of work: Supplying and installing 08 TK Plate® Settler high-rate settling modules.