HUNG NGUYEN WTP – 60.000 M3/NGĐ

PROJECT: DESIGN, CONSTRUCTION, SUPPLY, AND INSTALLATION OF TECHNOLOGICAL EQUIPMENT AND SCADA SYSTEM FOR HƯNG NGUYÊN WATER PLANT

  • Investor: NGHỆ AN WATER SUPPLY JOINT STOCK COMPANY (NAWASCO)
  • Status: New construction
  • Capacity: 60 MLD
  • Completion: 01/2022
  • Scope of work: Design, construction, supply, and installation of technological equipment and SCADA (Supervisory Control and Data Acquisition) system for Hung Nguyen WTP under the EPC Turnkey form.

The project includes:

  1. Water treatment cluster, capacity 60,000 m3/day:
    • Supply and installation of 08 agitators in the flocculation tank;
    • Supply and installation of 12 high-rate settling module TK Plate® Settler;
    • Supply and installation of 04 TK Collector® syphon sludge suction systems;
    • Supply and installation of HDPE filter (Leopold – USA).
  2. Reservoir;
  3. Pumping station, capacity 108,000 m3/day;
  4. Electrical – control system (SCADA).