SLUDGE TREATMENT STATION FOR THU DUC BOO WTP – 300,000 M3/DAY

PROJECT: DESIGNING, MANUFACTURING, PROCUREMENT, RETROFITTING, AND INSTALLATION OF ALL EQUIPMENT FOR THE EMERGENCY SLUDGE TREATMENT SYSTEM OF THU DUC WATER BOO.

  • Investor: Thu Duc BOO Joint Stock Company.
  • Status: New construction.
  • Capacity: 300 MLD.
  • Completion: 12/ 2022.

Scope of work: Designing, manufacturing, procurement, retrofitting, and installation of all equipment for the emergency sludge treatment system of Thu Duc WTP:

  • Sludge thickening tank.
  • Sludge conditioning tank.
  • Frame filter press system.
  • Automatic polymer dosing system.
  • Electrical control system.